Project Summary
Kolin Construction Limited is proud to have delivered a modern, purpose-built educational hub for Manurewa High School. This project involved the construction of a comprehensive facility designed to support both specialized language learning and essential school infrastructure, creating a vibrant environment for staff and students alike.
The new structure features a dedicated staff wing, including a professional office and integrated kitchenette, alongside four specialized language classrooms. Each classroom is designed with a focus on acoustic performance and comfort, featuring premium wall insulation and custom-designed acoustic wall panelling (Autex) to create an ideal learning atmosphere.
Extending the functional footprint of the building, we constructed a substantial outdoor area exceeding 600 square meters. This includes a massive, high-specification concrete hardstand area and a wide, sheltered timber veranda that runs the length of the building. To ensure full inclusivity and ease of access, the project incorporates a professionally engineered timber ramp system, seamlessly connecting the new facilities with the existing school grounds.
Built for durability and modern aesthetics, the facility is clad in robust horizontal weatherboarding, complemented by commercial-grade aluminium joinery that maximizes natural light. The inclusion of a dedicated equipment storage room ensures that the school’s practical needs are met without compromising the clean, organized design of the learning spaces.
This project highlights Kolin Construction’s expertise in delivering complex educational environments—balancing specialized interior fit-outs with large-scale civil concrete works—all completed to the highest standards of quality and craftsmanship.
Project Scope: Full Construction & Fit-out
Key Features: Four Language Classrooms | Staff Office & Kitchenette | 600m²+ Concrete Hardstand | Extensive Timber Veranda & Accessibility Ramp | Specialized Acoustic Wall Solutions | Integrated Storage Facility
Location:
Manurewa High School
Completed On:
March 2026
Project Type:
Refurbishment / Commercial


Teaching and language learning space at Manurewa High School
Refurbishment / Commercial
















